Constructalyze Request pilot access
SHT D-001  ·  Guided Tour

Give your team the one tool
that brings the entire picture into focus.

A walk through how Constructalyze™ turns the schedule, the field, and the money into one picture — from the superintendent's phone to the executive's desk. No login, no setup — just the product, working.

Field
Schedule
Boardroom
SHT D-101  ·  The Schedule

A real CPM engine, not a Gantt picture

Build the plan or import a Primavera P6 / MS Project file — Constructalyze™ runs the critical path live: forward and backward pass, float, constraints, and a working calendar with your holidays.

  • Editable start/finish dates that anchor via schedule constraints
  • Three build modes — logic-driven, fit-to-window, or stack-and-sequence
  • Contract-float readout: how much slack is left against the deadline
Demo
Build-out
!
MEP rough
Finishes
Turnover
CPM Gantt · critical path in oxide · milestone in gold · field flag ●
SHT D-201  ·  The Field

The superintendent's board, in their pocket

The field PWA shows the crew exactly what's working today and what's coming in the 8-week window — pulled straight from the schedule. When a super hits a speed bump, they flag it in two taps: category, note, expected delay, photo.

  • Works offline; syncs when signal returns
  • Flags ripple to the downstream trades automatically
  • Nothing to install — it's a web app they add to the home screen
Constructalyze™ · Field
My Board
!
TI-200 · CP
Framing Layout
Blocked by trade · +5d
TI-210
MEP Rough-in
Starts Aug 18 · Mechanical
Field PWA · a super flags a speed bump on the critical activity
SHT D-301  ·  The Loop

The weekly update, digitized end-to-end

The rhythm every well-run job already has — the scheduler and super walking the open constraints — with the ripple visible and a paper trail that lands in Procore where the owner can see it.

01
Field flags
Super marks a speed bump on the phone
02
On the Gantt
Marker appears on the activity bar
03
Weekly update
Resolve · Accept delay (live ripple) · Re-sequence
04
To Procore
Dates + record push out; field re-syncs
The Last Planner® weekly cadence — nothing in the industry closes this loop end-to-end
SHT D-401  ·  The Boardroom

Executive health, before the surprise

Every leading indicator — missed milestones, late submittals, cost-impact RFIs, the change pipeline, contract days added — measured against the schedule and rolled into a live financial-risk read. Negative spend flags the moment exposure crosses 1% of contract value.

  • Portfolio at a glance: who's red, who's drifting
  • Submittals judged against when the schedule needs them
  • Executive-only — the numbers stay in the boardroom
Harbor View Residences
38
Cost exposure$630K · 1.85% ▲ negative spend
Summit K-12 Campus
82
Cost exposure$95K · 0.16% · healthy
Executive Health · exposure meters marked at the 1% negative-spend line

Want to see it on your job?

Constructalyze™ is in live pilot on real projects with real money on the line. We're opening pilot access to a handful more builders who want their data working as hard as their crews.

Request pilot access
Evaluating seriously? Ask for a hands-on drive of the scheduler with a sample project — the fastest way to feel it.